Skip to main content
    Back to All Solutions

    iShield Solutions Series, Enterprise Operations (ERP) · Manufacturing

    Manufacturing & Asset Performance

    Design, Make and Maintain from One Model, with the Plant's Technology Protected

    Manufacturing & Asset Performance runs design, planning, execution, maintenance and quality on iShield One from one revision-controlled model, while iShield Nexus keeps the plant's technology assets recorded, protected and ready for a major disruption.

    MES, EAM, quality and PLM with OT bridge — one model from design to plant-floor execution.

    Who leads, who contributes

    • LeadiShield One
    • ContributoriShield Nexus
    • ContributoriShield Link

    Product lifecycle, material planning, manufacturing execution, enterprise asset and plant maintenance, and quality.

    The enterprise challenge

    The production loop and the technology loop meet at the machine.

    Manufacturers run two loops that rarely talk. The production loop — design, plan, make, maintain, improve — lives in manufacturing and maintenance systems. The technology loop — the servers, networks and gateways the plant depends on — lives with IT and security teams.

    When a controller fails, a gateway is compromised or a line stops, both loops are needed at once. Connecting them through the plant asset they share lets maintenance, security and command act on the same facts.

    Where iShield Nexus contributes

    iShield Nexus contributes technology asset records, security operations and crisis command for plant technology (Asset Management, Security Operations, Crisis Management). iShield One leads manufacturing; iShield Link bridges the plant floor.

    The Nexus angle

    Plant technology assets need security and crisis readiness.

    • Technology services and controls are managed apart from the business process
    • Evidence and ownership are fragmented

    Solution overview. Run discrete and process manufacturing on iShield One — MRP, MES, Plant Maintenance, EAM, Quality and PLM — with the iShield Link OT Bridge speaking OPC-UA, MQTT and Modbus. Nexus SecOps applies Purdue-zone guardrails.

    Buyer challenges

    • Revisions that drift

      A design change reaches the plant floor late, so material is planned and work is executed against an old revision.

    • Maintenance by calendar

      Assets are serviced on fixed intervals rather than on their condition, because plant telemetry is not connected to maintenance.

    • Plant technology off the record

      Servers, network switches and gateways on the plant floor are missing from the technology asset record, so vulnerabilities go unseen.

    • Disruption without command

      When a line stops for a technology reason, production, maintenance and IT each run their own response.

    Decision owners

    Plant manager
    Production priorities and when a line stops or restarts.
    Maintenance lead
    Maintenance strategy per asset — preventive, predictive or condition-based.
    Quality manager
    Disposition of quality deviations and corrective action.
    OT and IT security lead
    How plant technology is protected and when a security event becomes a crisis.
    Who this servesPlant operationsSecurityResilience leads
    Platform ownership

    Who leads, who contributes, and where each stops

    This is a cross-product solution. Each platform keeps its own responsibility and boundary; none is presented as a module of another.

    • Owns

      Product lifecycle, material planning, manufacturing execution, enterprise asset and plant maintenance, and quality.

      Boundary

      Does not hold the IT record of plant servers and networks or run security operations.

    • iShield NexusContributor

      Owns

      Technology asset records for plant IT, security incident and vulnerability handling, and crisis command for major disruptions.

      Boundary

      Does not plan production or maintain machines.

    • iShield LinkContributor

      Owns

      Plant-floor connectivity through the OT Bridge, and OEE and quality pattern agents, as listed in the composition.

      Boundary

      Moves and normalizes signals; it does not decide maintenance or quality actions.

    Module responsibilities

    ModulePlatformResponsibility in this solutionHands on
    Asset ManagementiShield NexusRecords plant technology assets and their relationships to services.Technology asset records
    Security OperationsiShield NexusHandles security incidents and vulnerabilities on plant technology.Security incidents and remediation tasks
    Crisis ManagementiShield NexusCommands major disruptions across production, maintenance and IT.Crisis decisions and communications

    Published composition, by owning platform

    The modules in the solution's published composition, grouped by the platform that owns them.

    Why this composition

    OEE, predictive maintenance and quality investigations all need the same asset and PLM context. Run MES, EAM, Quality and PLM together and the same revision-controlled BOM drives execution, maintenance triggers and CAPA — closed-loop across IT and OT.

    Cross-platform journey

    Two loops, one plant asset between them

    Follow a production asset through both loops. The production loop on the left is led by iShield One; the technology loop on the right is supported by iShield Nexus. They meet at the asset.

    8 stages across 3 platforms
    1. Design to plan · Product Lifecycle Management · MRP iShield One
    2. Make · Manufacturing Execution iShield One
    3. Sense · OT Bridge · OEE Anomaly Agent iShield Link
    4. Maintain · EAM & Plant Maintenance iShield One
    5. Improve quality · Quality (SPC, NCR, CAPA) iShield One
    6. Record the technology · Asset Management iShield Nexus
    7. Protect · Security Operations iShield Nexus
    8. Command · Crisis Management iShield Nexus

    Stage 1 of 8 · iShield One Design to plan

    Product Lifecycle Management · MRP

    A released revision drives material planning and the work orders that follow.

    Decision
    Engineering releases the revision.
    Exception path
    A change to a released revision triggers a change order.
    Recorded as
    Released revision and planned orders

    Next: Make in Manufacturing Execution (iShield One)

    Twin loops: the production loop (design, make, sense, maintain, improve) and the technology loop (record, protect, command) joined at the plant asset. Illustrative process, not a product screen.

    This journey shows how responsibilities are intended to divide between the platforms. It describes an operating model, not a pre-built integration between them.

    Governance and accountability

    Decisions, exceptions and who owns them

    Incident and crisis decisions are logged.

    DecisionAccountable ownerEvidence recordedException path
    Release a revisionEngineeringChange order and released revisionOpen work on the old revision is reviewed before release.
    Choose a maintenance strategyMaintenance leadAsset criticality and condition historyEmergency work is recorded against the asset.
    Accept a plant security riskRisk ownerException with compensating measures and expiryExpired exceptions return for decision.
    Declare a crisisCrisis leadSituation and impact on the decision logStand-down is logged with its reason.

    How plant security obligations are handled

    Plant security requirements and zoning are defined by the organization's OT and IT security owners. Nexus records the technology assets, incidents, vulnerabilities and exceptions against those requirements; no industrial security mapping is pre-built.

    • Security exceptions name the requirement they depart from, their owner and expiry.
    • Crisis decisions and communications are kept on the decision log.
    • Applicability of industrial security standards is decided by the security owner.

    Regulatory context

    Regulations and frameworks organizations in this domain commonly work with. Listed as context for planning, not as a certification, attestation or pre-built mapping.

    IEC 62443NIST 800-82ISO 55000 (Asset Mgmt)NCA OTCC-1:2022API 1164 (oil & gas)
    Standards and best practices

    Recognized practice behind the operating model

    Mappings describe how the operating model aligns with recognized practice. They are not attestations or certifications.

    On the Nexus side, technology asset records follow ISO/IEC 19770-1 and crisis command follows ISO 22320, both mapped on accepted module pages.

    FrameworkPracticeHow the solution operatesRelationship
    ISO/IEC 19770-1:2017IT asset management systemPlant technology assets are recorded with ownership and lifecycle.Mapped on the accepted Asset Management page.Aligned practice
    ISO 22320:2018Emergency management — command and controlMajor disruptions are commanded with roles, a decision log and communications.Mapped on the accepted Crisis Management page.Aligned practice
    AI, analytics and automation

    Intelligence in explicit modes, by platform

    Nexus AI capabilities assist the people involved; decisions remain with accountable owners.

    • Assistance drafts, answers or summarizes
    • Recommendation proposes for a person to accept
    • Predictive anticipates or flags
    • Workflow-triggered runs only as configured and approved
    • Exposure prioritization

      Recommendation

      Ranks vulnerabilities on plant technology with business context.

      Security Operations — Exposure prioritization
    • Situation summaries

      Assistance

      Condenses updates for incoming crisis leaders.

      Crisis Management — Situation summaries
    Business outcomes

    What changes for the organization

    Outcomes are described qualitatively. Figures are published only once evidenced.

    • One revision on the floor

      Plans and work orders follow the released design.

    • Maintenance by condition

      Plant signals inform when an asset is serviced.

    • Plant technology on the record

      The devices the line depends on are known, owned and patched.

    • One command when the line stops

      Production, maintenance and IT act under one command and decision log.

    What sets this solution apart

    • Security with production in mind

      Remediation that cannot fit a production window becomes an owned, time-bound exception.

    • Command across teams

      A single crisis structure brings production, maintenance and IT together.

    Planning and reference

    Delivery and industry context

    Planning information carried over from the solution record.

    30 / 60 / 90-day value plan

    Days 0–30 — Foundation

    Stand up the iShield workspace, integrate sources of truth, ingest baseline data.

    • Tenant provisioned in chosen region (KSA / UAE / EU / US)
    • SSO + RBAC mapped to enterprise identity (Entra ID / Okta)
    • Top 5 integrations connected and reconciled
    • Baseline KPIs measured before any change

    Days 31–60 — Activation

    Turn on automation, AI agents and guardrails for the priority value stream.

    • Workflows live for the top 3 use cases
    • Link AI agents enabled with explicit guardrails and approvals
    • Power-user enablement and admin training complete
    • First measurable KPI improvement vs baseline

    Days 61–90 — Scale

    Industrialize, roll out to additional teams, prove ROI to the steering committee.

    • Solution rolled out to additional business units / geos
    • Executive dashboard with target vs actual outcomes
    • Continuous improvement backlog established
    • Signed ROI memo and renewal / expansion plan

    Personas served

    CFOControllerVP ProcurementSupply Chain DirectorPlant ManagerPMO Director

    Illustrative industry scenarios

    Representative situations by industry. Regulations named here are context, not certifications or commitments.

    Oil & Gas (Upstream)

    API 1164 OT segmentation, predictive maintenance on rotating equipment, OPC-UA to ERP work-order automation.

    Discrete Manufacturing

    MES + PLM revision-controlled BOMs driving MRP; OEE anomalies routed to engineering with CAPA closure.

    Utilities (Power, Water)

    EAM lifecycle for substation / treatment-plant assets with NCA OTCC-1:2022 segmentation and crisis bridge to SOC.

    Bring Manufacturing & Asset Performance to your enterprise

    Get a tailored plan that shows which platform owns each step, with phased delivery and a deployment proposal.

    Your privacy choices

    We use strictly necessary storage to run this website. With your permission we also use first-party analytics to understand which pages are useful. Analytics stays off unless you choose "Accept all" or turn it on in "Manage". You can change your choice at any time from "Cookie settings" in the footer. See our Privacy Policy.